Subcontract — reinforcement fixing
Coast — Mombasa County · Closes 31 August 2026
Rate per kg or per tonne installed; high-rise couplers. Project pipeline: Confidential — high-rise residential (amalgamated plots, feasibility). Not a confirmed award.
Project pipeline: Confidential — high-rise residential (amalgamated plots, feasibility)
Trade categories: Structural / concrete sub-contract
Catchment: Mombasa, Kilifi, Kwale / Diani
Rebar fixing: cover looks right until the scanner says otherwise
Cover blocks kicked during pour — scanner failed at columns 14–18.
Formwork tolerance: when strike lines telegraph through every finish
Fair-faced intent — but tie holes and warp showed through paint.
Blockwork on high-rise coast sites: when the wall looks plumb but the core is hollow
The QS measured m². The clerk of works cored the lift shaft wall — voids where grout should have been. Rework on every floor above.
For suppliers & trades
Formwork & rebar teams — high-rise coast
Formwork erection, rebar fixing, and blockwork subcontractors: we are pre-qualifying trades for tower-cycle programmes.
Register once to get matched RFQs. Young teams and established contractors are both welcome.